Concrete lifting and mudjacking insurance in Ohio is general liability built for a contractor who drills through and raises slabs it did not pour, plus workers’ comp paid into the state insurance fund through Ohio’s Bureau of Workers’ Compensation unless the employer self-insures. The liability side turns on what happens below the slab, where the crew cannot see where the material goes.
This post is for contractors who raise and level settled driveways, sidewalks, garage floors, steps and pool decks by injecting slurry or polyurethane foam, and who fill voids under slabs. If you also pour new flatwork, the Pennsylvania flatwork post covers that side of the trade.
What makes lifting work different
A lifting crew works on concrete someone else placed, often years earlier, and its job is to move it. That changes the claims:
- Drilling through the slab can strike what is underneath: a sewer lateral, a water line, a gas or electric service, radiant heat tubing or drain tile.
- Injected material goes where pressure sends it, which can be into a basement through a wall crack, under a neighbor’s slab or into a floor drain.
- Over-lifting can push a slab against a foundation wall, a door threshold or an adjoining panel.
- Foam rigs carry chemicals, heated hoses and generators on a truck or trailer, so the equipment and auto questions matter as much as the liability ones.
Ohio ground adds to the picture. The Ohio Department of Natural Resources says glacial sediments are found throughout the state, and its Geological Survey maps karst to help limit karst’s impacts on infrastructure and buildings (ODNR karst maps). Soft fill and voids are why slabs settle, and an underwriter will want to know whether you fill voids under structures or lift flatwork only.
Damage below the slab
The claims that hurt lifting contractors are usually property damage to other people’s property: slurry that fills a drain line, foam that hardens in a sewer lateral, a drill bit through a buried line, a foundation wall pushed out of plumb. General liability is written for that kind of damage. It generally does not pay to redo the lift or repair the part of the slab the crew was working on.
Read the form closely. Some contractor policies restrict coverage for damage to underground lines, and many carry a pollution exclusion a carrier may raise when chemicals or slurry escape. Ask how both apply to injection work before you bind. Using the utility locate process before every drilling pattern, and documenting it with photos, is commonly the first question after a claim.
Next step. Send a description of your lifting methods, your rig list and your current policy through the quote form. We read the form before it binds.
Real-World Scenario: A polyjacking crew lifts a sunken garage floor at a house. Foam travels through a gap under the slab into a floor drain line and hardens there. Weeks later the drain backs up, and a plumber has to cut out and replace a section of the line under the floor. The property owner’s claim against the contractor is for damage to the drain line and the finished space beside it, which is other property under the general liability policy. Re-lifting the slab is the contractor’s own cost.
Completed operations when a slab settles again
A lifted slab that drops again is usually a warranty matter. When the drop leaves a trip edge and someone is hurt, it becomes a completed operations claim. Ohio’s construction repose statute, Revised Code 2305.131, measures from substantial completion of an improvement to real property. Whether a given lifting job counts as an improvement is a legal question, but the policy should treat the work as completed operations either way. The completed operations post explains the coverage.
Workers’ comp comes from the state fund
Ohio law requires every private employer to pay premium into the state insurance fund unless the administrator grants it the right to self-insure (Ohio Revised Code 4123.35). An employer that fails to comply loses the chapter’s benefits and cannot rely on common-law defenses in an injury suit. For contractors there is a further bar: a construction contractor or subcontractor that was not in compliance for a minimum of nine consecutive months on the date it entered a construction contract may not bring an action to enforce rights under that contract (Ohio Revised Code 4123.79). The where to get workers’ comp post explains how the fund route differs from other states.
Licensing works differently from comp. Ohio’s construction industry licensing board issues licenses only to heating, ventilating and air conditioning, refrigeration, electrical, plumbing and hydronics contractors, so local registration rules are the ones to check for lifting work. Contracts matter too: Ohio Revised Code 2305.31 treats a construction-contract promise to indemnify a party for its own negligence as void.
Rigs, trucks and the rest
Foam trailers, slurry pumps, compressors and drills belong on an equipment schedule under property or inland marine coverage, and the trucks that pull them belong on commercial auto. The Ohio page covers the state picture. To have a lifting account reviewed, use the quote form.