An Arizona tilt-up contractor’s largest exposure is the lift: a crane picks a cast panel off the slab, rigging takes the load, and the panel is set and braced. General liability has to cover that crane and rigging work, someone has to insure the crane and the panels, and workers’ compensation, which Arizona requires, has to cover a crew working in the heat.
This post is for contractors who form and cast tilt-up wall panels, lift and brace them, and pour the slabs they are cast on. It is about commercial warehouse, distribution and retail work in Arizona. For how concrete subs place coverage on large jobs generally, see insurance markets for concrete subs on large commercial jobs.
The lift is the exposure
Tilt-up concentrates risk into a short window. Panels are cast on the floor slab or a casting bed, cured, then picked by a large crane using inserts and rigging set into the panel. A failed insert, a rigging error, a panel that sticks to the slab, a gust of wind or a brace that lets go can drop a panel onto the slab, the crane, a worker or an adjacent building.
For the general liability policy, the questions are:
- Is crane and rigging work excluded? Some contractor policies exclude or limit hoisting operations. A tilt-up contractor cannot run with that exclusion.
- Whose property is damaged? Damage to the general contractor’s slab, another trade’s work or an adjacent structure is generally a liability claim. Damage to the panel you are lifting, which is in your care, may not be.
- Who directs the lift? If your crew signals and rigs, your policy will be in the middle of most lift claims, whoever owns the crane.
Riggers’ liability, in general terms, is coverage for damage to property of others while it is being lifted or moved and is in your care. Whether a tilt-up contractor needs it, or whether the panels are protected by the project’s builder’s risk or an installation floater, depends on the contract and on what the owner already insures. Settle that in writing before the lift.
Crane rental and the paperwork behind it
Most tilt-up contractors rent the crane. A crane rented with an operator and a crane rented bare are different arrangements, and rental agreements commonly make the renter responsible for damage to the crane and for liability arising from the lift. Read the agreement for who directs the operator, who is named as an additional insured and what indemnity you are signing.
Arizona voids a clause in a private construction contract that indemnifies the other party for its sole negligence (A.R.S. 32-1159), and limits indemnity in public construction contracts to the contractor’s own fault while still allowing additional insured designations. A broad rental indemnity may still reach further than you expect.
Power lines are part of the lift plan. Arizona bars operating hoisting equipment, or its load, within a set distance of a high voltage overhead line unless the danger is guarded against through arrangements with the utility (A.R.S. 40-360.42). The pumping and power lines post explains how line contact claims play out.
Next step. Send your policy, a recent crane rental agreement and a description of your lifts through the quote form. We read the form before it binds.
Real-World Scenario: A tilt-up contractor rents a crane with an operator for a distribution building. During a lift, an insert pulls out and the panel drops onto the floor slab, cracking it and damaging the crane’s outrigger pad. No one is hurt. The general contractor claims for the slab, the rental company bills for the crane under the rental terms, and the panel must be recast. Each of those costs lands on a different coverage, or on the contractor, depending on what was arranged before lift day.
Heat and the crew
Arizona crews pour and lift in heat for much of the year. Heat-related illness that arises out of the work is generally a workers’ compensation claim. Arizona operates its own OSHA-approved state plan for private-sector employers, and underwriters commonly ask how early pours start, how water and shade are provided and how new hires are acclimatized.
Arizona requires employers to secure compensation by insuring with a carrier authorized by the state’s insurance regulator or by proving financial ability to pay directly or through an approved pool (A.R.S. 23-961). An employer that fails to secure compensation loses the protections of the workers’ compensation chapter and can be sued without the defenses of assumption of risk or contributory negligence.
ROC licensing and the rest of the program
Arizona makes it unlawful to act as a contractor or bid on construction services without a license in good standing unless an exemption applies, and the Registrar of Contractors issues licenses. The Registrar requires a surety bond or cash deposit before an original license, and applicants required to carry workers’ comp include the policy number or proof of self-insurance. An unlicensed contractor cannot sue to collect for licensed work without proving it was licensed.
Beyond liability and comp, a tilt-up contractor commonly needs an umbrella sized to commercial contracts and coverage for owned forms, braces and equipment. The Arizona page covers the state picture, and the Arizona concrete construction page shows how the lines fit. To have a tilt-up account reviewed, use the quote form.