Concrete work on a bridge or highway job is insured with the same core policies as any other pour, but the public owner’s contract sets the limits, endorsements, registrations and bonds you must show before you start. Reading that contract comes before pricing the job.
This post is for concrete contractors, pumpers and ready-mix suppliers bidding as subcontractors or suppliers on public transportation work: bridge decks, barrier walls, approach slabs, paving and structures.
The contract sets the terms
On private work, your insurance program is mostly your own decision. On a transportation project the owner is a state or local agency, and its specifications state what every contractor must carry. The prime contractor is bound by those terms and passes them down to each subcontractor.
Ask for the insurance and bonding sections of the bid documents, along with the subcontract form, before you estimate. The guide to what clients require explains how to read a requirement. On public work those requirements are fixed by the owner’s specifications, so expect little room to negotiate them.
What usually changes in the insurance
The lines of coverage stay the same. The terms change:
- Limits. Work beside live traffic raises the stakes of a single accident, so required limits are often higher than on private jobs. An umbrella policy is the usual way to meet them, and the umbrella layering post explains how it sits over the primary policies.
- Additional insureds. The agency, the prime contractor and sometimes an engineer or a railroad must be named. The additional insured post covers the endorsements.
- Completed operations. A bridge deck or barrier wall stays in service for decades. The contract may require completed operations coverage to continue after the project is accepted.
- Work near a railroad. Projects that cross or run beside rail lines often carry a railroad’s own insurance requirements. Ask before you bid, because standard policies may need to be endorsed.
- Auto. Mixers and pump trucks working inside a traffic-control zone are a commercial auto exposure as well as a jobsite one.
Bonds are separate from insurance
Public owners protect themselves and the people who supply a project with surety bonds. Texas, for example, requires payment and performance bonds on public work contracts above set contract amounts (Texas Government Code ch. 2253). The prime contractor posts those bonds and may ask a large subcontractor to bond its own portion.
A bond is not an insurance policy. The surety guarantees your performance and expects to be repaid if it has to step in, so it reviews your finances and work history before it agrees. Ask your agent about bonding capacity early; it can decide whether you are able to bid at all.
Next step. Send the insurance and bonding pages of the bid documents through the quote form. We read the form before it binds.
Registration, licensing and wages
Several states add requirements that apply only to public work:
- California requires contractors and subcontractors to register with the Department of Industrial Relations before bidding on or performing public work, and registrants must have workers’ compensation coverage for any employees (DIR public works).
- Idaho separately requires a public works contractor license to engage in public works contracting, unless an exemption applies (Idaho Code 54-1902).
- Texas requires workers on public works paid for with public funds to be paid at least the general prevailing wage for similar work in the locality (Texas Government Code ch. 2258), and requires the governmental entity to have the contractor certify in writing that it provides workers’ compensation coverage on public building and construction projects.
Prevailing wage rules matter to insurance because they raise payroll, and payroll is the basis for the workers’ compensation premium. Price that into the bid. Louisiana’s licensing board also keeps a classification for highway, street and bridge construction that is separate from its general concrete classification, so check that your license covers the work.
Real-World Scenario: A concrete subcontractor wins the barrier-wall package on a highway widening job. The subcontract requires a limit above the contractor’s current program and names the state agency and the prime as additional insureds for completed operations. The contractor priced the job on its existing insurance costs. Adding an umbrella and the endorsements after award takes time, delays the notice to proceed and reduces the margin on the job.
Suppliers and pumpers on public jobs
Ready-mix producers delivering to a transportation project and pumpers placing a bridge deck are usually asked for the same certificates as the concrete subcontractor. The ready-mix and concrete pumping pages cover those programs, and the concrete construction page covers install crews.
Before you bid
Three steps keep a public job from changing your costs after award. Get the insurance and bonding specifications with the bid documents. Send them to your agent before you price the work, so the cost of higher limits or new endorsements is in the bid. Confirm registration and licensing in the state where the project sits.
If you have a public project coming up and want your program checked against it, use the quote form. We write concrete, so the review starts from how the work is actually done.